Factory
Our factory in Shenzhen
Tooling, SMT, assembly and QA under one roof in Bao'an, Shenzhen — 80,000 units a month across five product lines.
Factory
One address for tooling, SMT and final assembly.
Everything happens under one roof in Bao'an, Shenzhen. That matters less for the brochure and more for the day something goes wrong: there is no third-party factory to chase, no supplier between you and the person who can fix it.
We quote lead times against our own floor capacity, not against a subcontractor's promise.
- Tooling In-house mould shop. 15–20 days for a new housing, 7 days for a modification.
- SMT 3 lines, 0201 capability, AOI inspection after every reflow.
- Assembly 4 manual lines with in-line functional test on every unit.
- Quality AQL 2.5 incoming and outgoing. 100% burn-in on all power banks.
- Capacity 80,000 pcs per month across the five lines, current run rate.
- Lead time 25–30 days standard. 18 days expedited at +8% for repeat tooling.
At a glance
Numbers a buyer can check.
across 5 lines
one factory
charging hardware
order quantity
production
Common questions
Questions buyers ask before the first order.
How do you control quality?
Where is your factory, and can we visit?
How long do samples and mass production take?
Request a quote
Tell us the model, the quantity and the market.
A product engineer reads this, not a chatbot. Most quotes go out within one business day, with a real unit price and a real lead time.
- A model number or a reference photo — either is fine
- Quantity band and destination market
- Customisation: logo, colour, packaging, plug standard
- Compliance requirement for your country
Request received.
A product engineer will come back to you within one business day with a unit price, a lead time and the certification documents for the model you asked about.